7 months starting from a blank piece of paper. We worked with Red Tree building contractors to turn this around. We completed the electrical design, which involved assessing the school’s current load capacity to ensure there was sufficient power for the new Hub building.
Once we established all calculations and submitted a design proposal we proceed with the full electrical fit-out.















The installation consisted of a new sub main installation from the school’s substation for the additional power required to the new building. We installed all new power, lighting, emergency lighting, Car Park Lamppost Lighting, Fire Alarm, Intruder alarm, CCTV installation, Door Access, Gate Access, Disabled alarm, Data installation, Mechanical wiring and lighting protection.
A fast pace project with a very quick turn around from start to finish. A real accomplishment considering we started with a blank piece of paper.